Safe Work Procedures & Safe Job Procedures (20)
Structural Steel
Installing Rebar — General Vertical Work
Safe work practice and procedure for installing rebar in general vertical work applications.
SWP-001
Structural Steel
Reinforcing Bar — Walls, Columns & Slabs
Safe job procedure (SJP #20-11) for erecting reinforcing bar in walls, columns and slabs — crane and manual methods.
SJP-20-11
Structural Steel
Erecting Walls, Columns & Slabs
Step-by-step safe job procedure with crane lifting, guy-wire stabilization, and work platform safety.
SJP-20-11
Structural Steel
Rebar Impalement Protection
Installation of protective caps, wooden troughs, and covers to eliminate impalement hazards on exposed rebar.
SJP-04-05
Structural Steel
Rebar Ties & Ergonomic Tying Methods
Safe tie wire methods, figure-8 and saddle ties, posture rotation, and ergonomic practices during rebar tying.
SJP-14
Lifting & Rigging
FIBC Rebar Lifting Bags
Safe handling, filling, rigging, lifting, and transporting of flexible intermediate bulk container (FIBC) rebar lifting bags.
SWP-003
Lifting & Rigging
Lifting Operations (Crane & Rigging)
Safe rigging practices, sling pre-use inspections, crane lifting operations, taglines, and clear hand signals.
SWP-CR-002
Heights & Access
Portable Ladders
Safe setup, 3-point contact rule, 4-to-1 angle ratio, tie-off requirements, and ladder pre-use inspection checklist.
SWP-13-02
Heights & Access
Dropped Object Prevention & Tool Tethering
Overhead hazard mitigation, tool lanyards, tethering wristbands, tool bags, toe boards, and exclusion zones.
SJP-04-15
Emergency & Health
First Aid Procedures
Immediate emergency response, designated first aid attendants, assessment steps, treatment, and injury reporting.
SJP-03-01
Emergency & Health
Bloodborne Pathogens & Biohazard Cleanup
Universal precautions, decontamination, biohazard spill cleanup kits, and infectious waste disposal protocols.
SJP-04-12
Emergency & Health
In Case of Fire & Hot Work Fire Watch
Emergency fire alarms, evacuation routes, fire watch duties during hot work, and PASS extinguisher operation.
SJP-04-07
Emergency & Health
Hazardous Chemical Spills
Emergency chemical containment, SDS review, spill kit utilization, absorption, and environmental spill reporting.
SJP-04-13
Tools & Equipment
Defective Tools and Equipment
Pre-use tool inspection, red out-of-service tagging, quarantine, and repair/disposal of defective equipment.
SJP-04-08
Tools & Equipment
Lockout / Tagout (LOTO)
Zero energy state isolation, padlock application, danger tags, energy discharge, and group lockout protocols.
SJP-04-14
Tools & Equipment
Gas Cutting Tools (Oxy-Fuel / Propane)
Cylinder securing, regulator checks, flashback arrestor verification, shaded goggles, and fire prevention during cutting.
SJP-04-16
General Safety
Working Alone or in Isolation
Hazard assessments, periodic check-in schedules, communication protocols, and emergency assistance for isolated workers.
SJP-04-01
General Safety
Managing Suspected Impaired Workers
Signs of impairment, supervisory approaching steps, safe removal from site, transport, and documentation.
SJP-04-10
Workplace Conduct
Reporting & Investigating Bullying and Harassment
Procedures for preventing, reporting, investigating, and resolving workplace bullying and harassment complaints.
SJP-04-02
Workplace Conduct
Workplace Violence Prevention
Violence risk assessments, de-escalation protocols, emergency response, and post-incident investigation procedures.