Purpose: The purpose of this safe work practice is to ensure FIBC lifting bags are used safely to transport rebar (small bent rebar) from the fabrication facility to the job site and to provide safe work instructions for filling, lifting, and transporting filled FIBC bags. The rebar-filled bags may be lifted safely by forklift or crane by following the instructions in this practice.

PLEASE NOTE: THE BAGS ARE DESIGNED FOR SINGLE TRIP ONLY. ONCE THE BAG IS EMPTIED, DO NOT REFILL. DO NOT USE ANY FIBC BAG IF DAMAGE IS PRESENT. FIBC BAGS MUST BE RENDERED UNUSABLE BY EITHER CUTTING THE LOOPS OR SLICING THE BAG ONCE THE BAG HAS REACHED ITS FINAL DESTINATION. THIS MUST BE DONE TO ENFORCE SINGLE-USE COMPLIANCE.

UNDER NO CIRCUMSTANCES CAN A FIBC BAG BE USED IF ANY DAMAGE IS PRESENT.

Type of Bag used: The bags used by Canwide Steel are for rebar use and are manufactured for hard and sharp objects. These bags are upgraded from the standard 4.3 oz/sq yd material to an 8.26 oz/sq/yd + RF (260 GSM)7.67OZ + RF=(280 GSM)8.26OZ material. They are manufactured to be moved by a crane or forklift and come equipped with stevedore straps. We only purchase bags from suppliers who are members of the Flexible Intermediate Bulk Container Association (FIBCA). Tag must be legible and verified before use. The test certificate must correspond with the bag being used.

SECTION 1 – GENERAL INFORMATION

Prepared by: Phone #:
Site/Project: Site Address:
Prime Contractor/Client:
Prime Contact (Position & Name): Phone #:
On-Site Contact (Position & Name): Phone #:
Scope of Work Performed:
Any additional documents required? (Hot work permits, Lift plan, Toolbox talk, etc.)
If YES, please indicate type and reason:

Definitions

FIBC Flexible Intermediate Bulk Container
Safe Working Load SWL is the amount of load, (in pounds or kilograms), which a bag is designed to carry.
Safety Factor Industry standard requiring FIBC to handle 5-6 times its SWL (e.g., 5:1 or 6:1 SF)
Single Trip From point of manufacturing to final location of material use on site. As per ISO 21898 a FIBC Bag can be lifted more than once only if original material is untouched. Once in its final location, the bag must be rendered unusable.
Damaged/Unusable Bag Any bag with rips, tears, holes, missing/torn/frayed loops or straps. Bags stored unprotected for extended periods of time from UV or water/rain for extended periods are considered damaged and unusable. Any deterioration of the bag whatsoever.
Low Lift A lift from the trailer or flatbed truck into a site provided and approved container for transport to final destination on site.
CANWIDE STEEL Safe Work Procedure Doc ID: SWP-003
Rev: 00
FIBC Rebar Lifting Bags Date:

Safe Work Practices

Inspection

General Use

Loading Sequence Diagram
CANWIDE STEEL Safe Work Procedure Doc ID: SWP-003
Rev: 00
FIBC Rebar Lifting Bags Date:

After Use

Rendering bag unusable

Bulk Bag Specifications

Supplier: Global
Item REBAR BAG (Single trip) With Print- Canwide
Size 24" X 24" X 24" (inside size) - 61 x 61 x 61 cm (inner size)
Bag Style Tubular
Body Fabric Weight 8.26 oz/sq/yd + RF (260 GSM)7.67OZ + RF=(280 GSM)8.26OZ
UV Treated yes (150kly as per ISO standard)
Max Capacity 1000 KG
Safe Working Load (SWL) 5:1
Stitching Styles standard - Overlock & Safety
Perimeter Belt Yes - 1.57" (4cm)
Top Style 4.72 oz/sq/yd + 30gsm coating. (160+30gsm) duffle top with ties
Top size 25.5" (65cm)
Bottom Style Flat
Loops Style Cross Corner
Loop color white
Loop width 3" (7.5cm)
Loop length 10"
Stevedore Straps Yes for Crane lifting - 2.75" (7 cm) width, total length 48"
Test Certificate Certificate No.12986.1/24.1 by Labordata International Materials Testing Institute
CANWIDE STEEL Safe Work Procedure Doc ID: SWP-003
Rev: 00
FIBC Rebar Lifting Bags Date:

HANDLING A FIBC BY A FORKLIFT

Forklift Handling
CANWIDE STEEL Safe Work Procedure Doc ID: SWP-003
Rev: 00
FIBC Rebar Lifting Bags Date:

HANDLING AN FIBC BY A CRANE

CANWIDE STEEL Safe Work Procedure Doc ID: SWP-003
Rev: 00
FIBC Rebar Lifting Bags Date:

THE FOLLOWING PROCEDURE IS TO BE FOLLOWED BY ALL END USERS:



CANWIDE STEEL LTD. INSISTS THE FOLLOWING PROCEDURE BE FOLLOWED ONCE THE FIBC BAG HAS LANDED AT ITS FINAL DESTINATION ON THE SITE:

  1. RENDER THE BAG UNUSABLE (SEE DEFINITIONS)
  2. PLACE THE BAG IN THE APPROPRIATE WASTE/RECYCLING BIN IMMEDIATELY ONCE EMPTIED
  3. DO NOT LEAVE SMALL AMOUNTS OF UNUSABLE REBAR IN THE BAG. EMPTY COMPLETELY.
  4. DO NOT ALLOW THE BAG TO BE RE-FILLED WITH ANYTHING
  5. NEVER RE-USE THE REBAR FIBC UNDER ANY CIRCUMSTANCES
CANWIDE STEEL Safe Work Procedure Doc ID: SWP-003
Rev: 00
FIBC Rebar Lifting Bags Date:

Damaged FIBC

Training

The FIBCA (Flexible Intermediate Bulk Container Association) has several safety training videos that can be used for training. To access these videos, go to www.FIBCA.com

The following videos are available.

All personnel handling FIBC bags must read and have a copy of this Safe Work Practice. Only trained and competent workers may perform lifts using cranes or forklifts with FIBCs. Periodic toolbox talks or refresher sessions should be held, especially if supplier instructions change.

Compliance with WorkSafeBC or governing safety standards is mandatory

Roles and Responsibilities

Riggers and Operators:
Perform pre-lift inspections and confirm bag suitability for each lift.
Ensure lifting methods meet this SWP.
Ensure tag matches test certificate.

Supervisors / Site Leads:
Ensure only rebar FIBCs are used for rebar.
Confirm FIBC bags are rendered unusable once landed at final destination on site and "Not for Reuse" is enforced.
Ensure tag matches test certificate.
Ensure clarification on loading and lifting techniques is communicated.
Report any re-use of FIBC bags immediately to Site supervisor or CSO

Workers:
Follow this SWP for all filling, lifting, and disposal tasks.
Report damaged or questionable bags immediately.
Ensure rebar is loaded properly as per this SWP
Report any re-use of FIBC Rebar bags immediately to Supervisor / Site Lead

CANWIDE STEEL SWP Acknowledgment Doc ID: SWP-003
Rev: 00
Employee Sign-Off Record Date:

Employee Declaration: I confirm that I have read, understood, and will strictly comply with the Safe Work Procedure for FIBC Rebar Lifting Bags operations. I agree to utilize required PPE, actively participate in pre-lift meetings, and immediately report any unsafe conditions. I acknowledge that failure to follow this SWP may result in disciplinary action.

Employee Name (Print) Signature Date
Arshdeep Singh
Badal dhakal
Bandeep Singh
Beerinder
Bhavkaran Singh
paramjeet Singh
Akashdeep Singh
Emmanuel Ackom
Gaganpreet Singh
Gursewak singh
Harjot Singh
Jasspreet Singh
Kamalpreet singh
Karan
Lovepreet Singh
Lovejeet Singh
Manjot Singh
Manwinder Singh
Manveer Singh
Mehakdeep Singh
Navkaran Singh
Paramveer Singh
Sukhmandeep Singh
Sukhraj Singh
Suraj Parkash Singh
Tinderpal Singh
Vijaypal Singh