Site Information
Site Safety Statistics
| Ref. | Item Inspected | Acceptable Condition? | Comments | ||
|---|---|---|---|---|---|
| YES | NO | N/A | |||
| Site Office/Common Areas | |||||
| SO1 | Notice / Safety Board Current (JOHS meetings, WSBC Inspections, etc) | ||||
| SO2 | Site Plan / Crane Plan Posted | ||||
| SO3 | First Aid Information Posted | ||||
| SO4 | JOHS Committee members / Worker Safety Rep. names posted | ||||
| SO5 | Lunch Room Kept Sanitary | ||||
| SO6 | Adequate stock of PPE | ||||
| Documentation Review | |||||
| DR1 | OHS Program available on site | ||||
| DR2 | Safe Job Procedures Current and signed-off by applicable workers | ||||
| DR3 | Exposure Control Plans available and site specific (where required) | ||||
| DR4 | Fit Testing Records available on site and current (where required) | ||||
| DR5 | Formwork Drawing & Engineering | ||||
| DR6 | Crane documentation where required (incl. operator & rigger logs) | ||||
| DR7 | Orientation records available and current for all workers | ||||
| DR8 | Training records available on site and up to date | ||||
| DR9 | Pre-Shift Hazard Assessment completed and signed-off by workers | ||||
| DR10 | Accident/Incident Investigations performed & within required time | ||||
| DR11 | SDS binder available for actual material on site (spot check) | ||||
| DR12 | No SDS older than 3 years | ||||
| DR13 | Tool-box Talks completed weekly and records available | ||||
| DR14 | 30M33 is available for work within limits of approach (when applicable) | ||||
| General Site Conditions | |||||
| G1 | Clear Access/Egress/Exit routes to all work areas | ||||
| G2 | Work areas with sufficient light to perform the task safely | ||||
| G3 | Prompt Incident/Injury Reporting | ||||
| G4 | Site Housekeeping. No accumulation of dust and/or debris | ||||
| G5 | Floor Openings in work area covered & marked or guarded | ||||
| G6 | Guardrails properly secured to work surface, 8 ft spans or less | ||||
| G7 | Guardrails Top & Mid rails and Toe board at required heights | ||||
| G8 | Stacked materials are stable (interlocked, strapped, or other means) | ||||
| G9 | Hazardous material properly stored and labelled | ||||
| G10 | Powered tools in good condition with guards in place | ||||
| G11 | Hand tools in good condition | ||||
| G12 | Tool Tethering when at height or near leading edges | ||||
| G13 | No materials Leaning on Guardrails or in stairwells | ||||
| G14 | Protruding rebar and other sharp objects in work area protected | ||||
| G15 | Minimum site PPE used by all workers | ||||
| G16 | Specialized PPE used when required | ||||
| Fall Protection | |||||
| FP1 | Guardrails on all work platforms higher than 4' | ||||
| FP2 | All workers above 10' have a fall protection system in place | ||||
| FP3 | Workers trained on systems used, and training is current | ||||
| FP4 | Personal Fall Protection systems in use are in good condition | ||||
| FP5 | Anchor/Anchorage adequately selected (strength & location) | ||||
| FP6 | Fall Protection Equipment compatible connections and proper setup | ||||
| FP7 | Site Specific Fall Protection Plan for any work above 25' | ||||
| FP8 | Material Tied-back when near edges | ||||
| Scaffolds & Work Platforms | |||||
| SC1 | Chosen For Suitability of Task | ||||
| SC2 | Inspected Prior To Use by competent workers | ||||
| SC3 | Assembled Correctly by competent workers (where applicable) | ||||
| SC4 | On firm, flat and Level Surface | ||||
| SC5 | Wheels Locked (when applicable) | ||||
| SC6 | All guardrails rails and braces in place | ||||
| SC7 | All Connectors Installed | ||||
| SC8 | Platforms at least 20 inches wide (scaffolds) | ||||
| SC9 | Safe Access/Egress | ||||
| SC10 | Manufacturer's specs or Engineering documents available | ||||
| Silica & Respiratory Protection | |||||
| SP1 | Exposure Control Plan adhered To (silica, drywall, etc) | ||||
| SP2 | Respirator Fit Tests Current for the Make/Model/Size used | ||||
| SP3 | No dry sweeping observed | ||||
| SP4 | Engineering Controls (vacuum, wetting) available on site | ||||
| SP5 | Used as primary control method where practicable | ||||
| SP6 | Used correctly as per manufacturer's instructions | ||||
| SP7 | HEPA Vacuums in good operating condition (when applicable) | ||||
| SP8 | Filters/Pre-filters changed regularly (when applicable) | ||||
| SP9 | Access restricted/controlled to work areas where required | ||||
| SP10 | Replacement respirators and filters available | ||||
| SP11 | Dust and waste double bagged and disposed of as per site ECP | ||||
| SP12 | Posted signage indicating hazard | ||||
| SP13 | Equipment and clothes decontamination | ||||
| SP14 | Workers trained/instructed in procedures to follow | ||||
| Ladders | |||||
| L1 | In good working condition | ||||
| L2 | Secured top and bottom | ||||
| L3 | Set at a 4:1 ratio (75° angle) | ||||
| L4 | Setup on a firm, flat and level base | ||||
| L5 | Extends 3' above landing surface (access ladders) | ||||
| L6 | Appropriate ladder for job (duty rating, type, length, material) | ||||
| L7 | Safe use (3-point contact, not on or above top rung/step, etc.) | ||||
| Mobile Equipment | |||||
| ME1 | Pre-use inspection current and records available in machine | ||||
| ME2 | Operators trained and current | ||||
| ME3 | Fall protection used where required | ||||
| ME4 | Alarms and safety devices in place and operational | ||||
| ME5 | Machine guards in place | ||||
Corrective Actions Log
List any hazards or unsafe conditions noted above and the corrective action taken.
| Ref. Item # | Corrective Action Required | Action Assigned To | Date Completed | Done |
|---|---|---|---|---|