FALL PROTECTION PLAN
OHS PROGRAM – WORK AT HEIGHTS
FORM #FPP-01 | REV. 01 | WorkSafeBC § 11.2
1
Project / Site Description
First Aid Information
2
Site-Specific Details for Work at Heights
Use the diagram / sketch (Section 3) to illustrate the following details on the worksite plan.
Maximum Heights
m / ft
m / ft
m / ft
Toe-Holds (for slopes of 8:12 or more)
Power Line Proximity
3
Worksite Diagram / Sketch
Use this area to describe or attach a site sketch showing anchor locations, building elevations, access points, and hazards. Attach additional pages if needed.
Attach site sketch / diagram
Click to browse or drag & drop · Image or PDF accepted
4
Fall Protection System
Follow the fall protection hierarchy per Section 11.2 of the OHS Regulation. Complete one card per distinct work area.
Work Area 1
5
Rescue Procedures
6
Record of Review
This plan has been reviewed with the following workers. Employers should retain this page.
| # | Worker's Name | Signature (type to sign) | Company Name |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 |
Supervisor Sign-Off
WorkSafeBC Reference: This form is based on the WorkSafeBC Fall Protection Plan template.
Refer to Section 11.2 and 11.3(1)(b) of the OHS Regulation.